Submitted by Washington State Department of Transportation
Work to replace a steel bridge beam damaged by an overheight load on the US 12 Wishkah River Bridge has been completed a day earlier than scheduled. As a result, WSDOT has cancelled a closure of the bridge that was to occur Friday night, January 25.
Real-time traffic information is available on the WSDOT mobile app. Advanced information about highway maintenance and construction activities is available on the Grays Harbor County web page.
Featured photo credit: Skip Radcliffe